KS ORKA Indonesia reaching the 100 MW milestone of power under wellhead

KS ORKA is developing three projects in Indonesia with a total reservoir capacity of 380 MW.  The project teams have been drilling with three drilling rigs and just recently proceeded with the Spud-In of the 20th well.

The total power under well head based on three step utilisation, i.e. expander, ORC high and ORC low, has now reached the 100 MW level.  The first units are already in the commissioning phase.